Pack1 Farete - 10 KW + Switchboard
CONNECTION PROCEDURES
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).
NOTE: We remind you to order the right power range according to the stand total electricity consumption.
For installed power higher than 100 kw ask for a quotation to vendite@bolognafiere.it
Electric systems at stands must be installed in conformity to Italian Ministerial Decree 22/01/2008 and CEI (Italian Electric Standards Committee) specifications.
Installations not in compliance with the above mentioned specifications and without the submission by the Exhibitor of the the mandatory forms "Statement of correct execution of the electric system and set-up" and "Statement of conformity of the electric system," will not be connected the power grid by Bolognafiere Officially authorized electricians, (for electrical system installed by non-italian companies the exhibitor must request to BolognaFiere the "Verification of compliance of the electrical system" at his own expenses).
NOTE: We remind you to order the right power range according to the stand total electricity consumption.
For installed power higher than 100 kw ask for a quotation to vendite@bolognafiere.it
To install this Web App in your iPhone/iPad press and then Add to Home Screen.